When you’ve invested in a top-of-the-line Hydraflu Dock Leveller to streamline your operations but have no idea how to install it properly. This may lead to unexpected results. If you are a first-time user, you surely have not imagined what will happen if the dock leveller is not installed correctly.
Challenges without Prior knowledge of Dock Leveller Installation
Let us tell you that it could lead to a domino effect of problems, once you start your operations such as safety hazards, equipment damage, decreased productivity, job floor accidents, and even potential legal issues based on all the troubles.
Due to all these scenarios, a comprehensive installation guide is inevitable to save you from all the headaches. This installation guide will become your secret to successful operations later on. This installation guide for the Hydraflu Dock Leveller is just like a roadmap, step by step, turn by turn, guiding you to your operation over it.
Importance of Installation Guide
“No matter which equipment and machine you are going to install and operate, without a proper installation guide, you will end up in a complete mess. It is essential for ensuring the equipment and fork lifter’s safety, overall optimal performance, longevity, and durability.”
By following the guide, you can prevent accidents because a professionally installed Hydraflu Dock Leveller will prevent accidents and injuries that can lead to costly downtime and also legal complications later on. Installation with proper professional guidelines will increase job floor productivity and reduce product damage.
We will now move step by step towards the dock leveller installation, from delivery of the package to its first successful operation.
Component Identification and Inspection/Verification of Parts and List
When you get the package delivered, inspecting it before and after opening is an integral step. Nowadays, when the package is delivered, use the Mobile Phone camera to make a short video clip, just in case of an issue, you can provide it with supplies.
You can make a list of components such as the Hydraflu Dock Leveller Power Pack, and other components, supplied with the package and in case of any missing components, you can contact the supplier and cross-check the details to make the Dock Leveller Installation a hassle-free and smooth task.
Understanding Dock Leveller Installation Precautions
A safe dock leveller installation is accompanied by precautions, danger alerts and warnings. However, there are always precautions and warnings associated with all the machinery you purchase, even small machines like hand drills to dock levellers. You need to understand every point of it before installation begins.
So, before the beginning of the Hydraflu Dock Leveller installation, safety prioritization is crucial. You can always use additional support for the dock leveller platform and lip while working beneath or in front of the equipment.
You are supposed to install it only if you are professional, else there are chances that you either will install it inappropriately or will break some component. You also need to wear all the standard safety equipment while installing. Again, only trained professionals should proceed with dock leveller installation, electrical connections and grounding following the manufacturer’s instructions.
Usually, the manual that you will get from the manufacturer will contain all the precautions, warnings, cautions and notices for Dock Leveller Installation. You need to carefully read and understand each of them. These are drafted after comprehensive research and analysis by the manufacturer to ensure the safety compliance of dock levellers.
Preparation of the Pit and place to install the Dock Leveller
Hydraflu Dock Leveller installation requires finding the best position and preparation of the pit. You need to prepare the installation place before lowering the dock leveller into the pit. In order to do this, first of all, remove all debris from the pit and thoroughly sweep it clean. After doing this, you need to inspect the dock leveller pit and ensure that it has been constructed according to the drawings of dock leveller installation.
This can be done by verifying the dimensions of the pit and matching it with the drawing. It usually consists of:
- Checking the span of the opening at both the front and rear.
- Noting the elevation difference from the dock surface to the bottom at all four corners.
- Calculating the length of the recess along both edges.
- Assessing the diagonal measurements of frame.
If any measurement deviates by more than 1/8 inch (3.18 mm), you need to contact the supplier or the construction department responsible for the pit construction. If everything is fine till this point, you can start preparing the Dock Leveller to install into the Pit.
Dock Leveller Installation steps
Dock leveller installation involves multiple steps from preparing the dock leveller to installation, followed by installation and post-installation commissioning.
Dock Leveller Installation Preparations
Most dock levellers are equipped with hoisting hooks that are locked to surface board. You can find the attached diagrams with the package. If not, you can follow the 4 steps below:
- You can start by dismantling any protective bars and command board. Please ensure that the width of the platform and hoisting hooks are as narrow as possible.
- Check that the fixing parts for the hoisting hooks are fixed, ensuring the hooks can move unrestrictedly.
- After completing this all, lock the elevating chain to the hooks to a pickup and elevation machine. Also, make sure that the machine you are deploying has the accepted specification to complete the task.
- Lastly, take out the supports attached to the leveller, and the preparation step will conclude.
Please note that a protective seal is included with the Dock Leveller, so avoid over-securing the hoisting hooks as it may make the seal non-functional.
Installing Dock Levellers in the Pit (Step by Step guide)
- The first task is to calculate the spacer pack height by checking the height of the structure.
- It is then followed by aligning the separate spacer pack height with the Dock Leveller elevation.
- Then you can lower the dock Leveller using any available lifting device into the pit. Also, verify that the articulation pivot frame is firmly compressed against the back pit edge angle.
- Adjust front shim Location by ensuring the rear edge of the platform, whether it is parallel to the rear hinge and that there is an equal gap along both sides of the leveller.
- Once the shim welding is done, raise the platform and check for any binding. If binding occurs, reposition the leveller or adjust the shims.
- Shim the maintenance prop and ensure it is securely locked in the upright position.
- After completing the welding process, now is the time to paint all welds and shims.
- Finally Remove temporary frame sections after permanent installation.
After the Dock Leveller Installation process is complete, now you can move to the installation of the control panel and electric wiring.
Installation of Control Panel and connecting wiring
To install the control panel, you can follow these steps:
- First of all, mount the control panel with the bottom of the panel, above the dock floor.
- It is usually pre-installed but if not already installed, you can mount the electrical disconnect panel, preferably next to the control panel.
- The third task is to set up and link the operating wiring accurately with respect to instructions provided for Hydraflu Dock Leveller Installation. After that, connect the whole system accurately.
Important Note: In temperature-controlled environments, ensure proper isolation or prevention of thermal and vapour transfer.
- Finally, you need to attach a placard (if any) in a clear view near the dock leveller or vehicle restraint operations. Use a nylon cable tie to secure it near the control box.
Conclusion
Ensuring the Hydraflu Dock Leveller Installation compliance, you can install it properly in the pit and start the operation with safety and yield maximum efficiency.